Tower Cranes are large framed cranes used to remove and transport heavy loads. These machines, which are frequently used in construction sector and other industries, are quite strong in terms of height and carrying capacity. The installation of tower cranes is quite complex process and requires careful planning, excellent teamwork and convenient tools and equipment. In this article, tower crane installation requires detailedYou can be sure that you will be treated in a way.
- Planning
Tower Crane installation, first of all, requires a good planning. At this stage, crane operators, construction engineers and other related personnel are met, where tower cranes will be placed, which type of cranes are used, which materials will be used and decide to other important factors. In addition, it is necessary to pay attention during installation, about safety protocols and legal regulations that need to be paid attentionYou should also know.
- Basic Preparation
The installation starts primarily with a foundation construction process. The foundation is specially designed according to factors such as the height and carrying capacity of the crane. Usually, a reinforced concrete foundation is used. The foundation should be dimensional to allow the installation of the crane cabinet and the lifting arm.
- Installation of Crane Parts
After the foundation is prepared, the crane parts are assembled. Since many parts of tower cranes, this process can take quite long. The assembly process includes the installation of the crane cabinet, the installation of the lifting arm, crane arm, roof rail, hooks, weight blocks, crane hooks, cable blocks, gears, motor and other parts installation. Each piece should be carefully placed and fixed.
- Cable Assembly
One of the most important parts of tower cranes is cables. Cables are used for lifting and handling of the crane cabinet. Installation of cables is wrapped in the drum inside the crane cabinet. The cable winding process is quite sensitive operation and should be done diligently by crane operators.
- Power
Tower Crane power supply is required for operation. This is usually provided by a generator or electrical grid. The power supply of cranes is necessary for the operation of motors and other parts in the crane cabinet. Also, the control panel controlled by the crane operator is connected to the power supply.
- Test Stage
After the installation of cranes is completed, the test should be tested. The test stage includes the control of the movements and carrying capacity of the crane cabinet. The tests are carried out by inspections made by crane operators and construction engineers. At the test stage, it is sure that the crane works safely and accurately.
- Maintenance and Repair
After the installation of tower cranes is completed, regular maintenance and repair operations are required. Maintenance operations include cleaning, lubrication operations and other routine operations of the crane cabinet. Also, crane parts should be checked regularly and repaired when necessary.
Crane types and you can read our other article about the use areas. The installation of tower cranes is a rather complex process and requires careful planning, teamwork and convenient tools and equipment. It is important to have information about security protocols and legal regulations that should be taken into account at the installation stage. It is also important to carry out regular maintenance and repair operations of the crane. This is the long of the crane.ensure the use of life and safely.